Commercial Geothermal Project at
Sherburne Earlville School

Vertical bore hole being
drilled for Geothermal
Both Drilling Rigs at work


Geothermal supply and return
pipe going to the building

Fusing the Geo pipe together



Drilling Rigs



Sand and Grout that goes in the vertical bore holes for better thermal conductivity

Drilling Rigs again


Geothermal pipe making
our loops

Sand and Grout going in
the bore hole

All the bore holes before
being connected

Fusing pipe from the building
to the loop field

Drilling more bore hole for
vertical loops

The loop field in progress


The bore holes are drilled in parallel lines
Work in progress

 

Visit our other business Barney and Sons Drilling